Four Seasons Surf Club
Client: Fort Partners
Location: Surfside, FL
Size: 1,000,000+ SF
Status: Completed 2018
Architect: Richard Meier, Kobi Karp
Construction Manager: Coastal Construction
The Four Seasons Hotel and Residences has brought to the historic surf club on Collins Avenue two new 12-story towers. The hotel tower features 77 guestrooms and 30 hotel residences, and the condominium tower includes 121 private condos. Amenities include two restaurants, oceanfront cabanas, a state-of-the-art fitness facility, and four swimming pools.
Four Seasons Surf Club
The PUBLIC Hotel and Residences, 215 Chrystie Street, New York, NY
Client: Witkoff Group
Location: New York, NY
Size: 258,000
Status: Completed 2017
Architect: Herzog & de Meuron, Beyer Blinder Belle
Construction Manager: Triton Construction
Cumming was retained by the Witkoff Group to serve as project manager for the PUBLIC Hotel and Residences in New York City, Ian Schrager’s latest boutique hotel concept. The new 28-story, 258,000-sq-ft. property, located at 215 Chrystie Street in Lower Manhattan, includes 376 guestrooms and 11 luxury condos. Also included are an arts club, two Jean-Georges Vongerichten restaurants, three bars, and related public areas. The PUBLIC’s hip concept incorporates a minimalist approach, providing guests with an affordable yet comfortable and high-quality room.
The PUBLIC Hotel and Residences, 215 Chrystie Street
EDITION Hotel & Residences, Miami
Client: Marriott International
Location: Miami Beach, FL
Size: 300,000 SF
Status: Completed 2015
Architect: NBWW
Construction Manager: Coastal Construction
EDITION Hotel & Residences, Miami
EDITION Hotel & Residences, New York
Client: Marriott International
Location: New York, NY
Size: 380,000 SF
Status: Expected Completion 2019
Architect: Rockwell Group
Construction Manager: CNY Group
Cumming was selected to manage four new EDITION hotels — one each in London, Miami Beach, New York City, and West Hollywood. EDITION is a luxury lifestyle hotel brand created by Marriott International in partnership with Ian Schrager. The New York EDITION opened in the fall of 2019 and includes an outdoor wrap-around terrace and gardens that overlook Times Square as well as a fine dining experience at 701West helmed by Chef John Fraser. The West Hollywood EDITION also opened in the fall of 2019 and is located on the corner of West Sunset Boulevard and North Doheny Drive, where West Hollywood meets Beverly Hills. It features 140 guest rooms, 48 suites with two penthouses, 20 luxury residences, and over 6,500 square feet of meeting and event space. The West Hollywood EDITION also includes a signature restaurant, lobby lounge, basement club, expansive rooftop pool, and a six-treatment room spa.
EDITION Hotel & Residences, New York
Four Seasons Hotel & Private Residences, Fort Lauderdale, FL
Client: Fort Partners
Location: Fort Lauderdale, FL
Size: 672,000 SF
Status: In Design
Architect: Kobi Karp
Construction Manager: TBD
Lehrer Cumming is advising the client on this new luxury hotel and condominium on the oceanfront in Fort Lauderdale. Upon completion, the 22-story building will feature 148 guestrooms, 83 condominium units, and high-end amenity spaces for guests and residents.
Four Seasons Hotel & Private Residences
Four Seasons Resort, Palm Beach, FL
Client: Fort Partners
Location: Palm Beach, FL
Size: 284,000 SF
Status: Under Construction
Architect: Leo A Daly & Martin Brudnizki Design Studio
Construction Manager: First Finish Construction Company
We are guiding the renovation of the Four Seasons Resort in Palm Beach, a two-phase project that is addressing all 207 guestrooms across three buildings. Additional program elements includes new landscaping, a remodeled pool deck, a new second pool, and a new restaurant concept.
Four Seasons Resort, Palm Beach
Chicago Peninsula Rooftop Bar, Chicago, IL
Service(s): Cost Estimating
Location: Chicago, IL
Division: Cumming
Cumming is providing cost management services for the Chicago Peninsula Rooftop Bar project. Our scope for the project is similar to the scope for the Peninsula Suite project, with Cumming providing cost services from project kickoff through construction administration and close-out.
Chicago Peninsula Rooftop Bar
EDITION London, London, UK
Service(s): Project Management
Location: London, UK
Division: Cumming
Cumming served as development manager for the London EDITION hotel, opened by Marriott International and Ian Schrager Co. in September 2013. The London EDITION hotel is the second to open since the brand’s 2011 Istanbul debut. Reporting directly to Marriott’s corporate leadership team, Cumming provided overall corporate program management of the Marriott International-owned EDITION projects, as well as project-level development management on the London luxury lifestyle hotel, which occupies the former historic Berners Hotel. The London EDITION features 173 guestrooms, a Jason Atherton-inspired restaurant, four bars, a special event space, meeting rooms, and a modern lobby that accentuates the building’s original historic character. The hotel is located in central London’s Fitzrovia neighborhood.
EDITION London
Metropolis Phases I and II, Los Angeles, CA
Service(s): Cost Management
Location: Los Angeles, CA
Division: Cumming
Shanghai-based Greenland Real Estate Group contracted Cumming to carry out a peer review of their current budgets on phase one of its $1.2 billion, 6.33-acre Metropolis development located north of LA Live. The peer review appointment has led to continued estimating and ad-hoc cost management services throughout phase one, which includes construction of a 350-room hotel as well as a 310-unit condominium tower. In addition, Cumming is likely to provide services for phase two, which will include a 40-floor, 451-foot tower with approximately 510 condo units, as well as a 63-floor, 671-foot tower with approximately 740 condo units.
Metropolis Phases I and II
One Dalton Street, Boston, MA
Service(s): Cost Management
Location: Boston, MA
Division: Cumming
Standing 61 stories tall and affiliated with a recognized luxury brand, One Dalton will function as an unparalleled five-star, 225-room hotel, and as a 160-unit luxury residence. Guests will enter the hotel through the ground-level lobby under a covered porte cochere while residents will access their suites through a private, distinct residential lobby. Food and beverage outlets include a café, restaurant, and lounge with additional features that include meeting spaces, a fitness center, an indoor/outdoor pool, a luxury spa and relaxation room, locker rooms, and a business center.
One Dalton Street
Yotel, San Francisco, CA
Service(s): Commissioning
Location: San Francisco, CA
Division: Cumming
Cumming was recently contracted to provide project and construction management services for the 203-key Yotel Hotel in Downtown San Francisco. Subsequently, Cumming’s energy group was brought in to help commission the beautifully renovated building, as well as provide expert LEED guidance and assist Yotel in achieving LEED Silver certification. One of the hotel’s many cool features is an advanced guestroom lighting control system that is integrated with the HVAC.
Yotel
Mandarin Oriental, Boston, MA
Service(s): Project Management, Cost Management
Location: Boston, MA
Division: Lehrer Cumming
Lehrer Cumming provided project and cost management services for the renovation of the Mandarin Oriental Hotel in downtown Boston. The $7 million project included a spa renovation and upgrades to 793 rooms on 13 floors, with each room receiving all new bedding, TVs, artwork, lighting, and back-painted glass tops on all case goods. An additional 132 rooms were converted from king rooms to double/double rooms, and received all the same upgrades noted above, as well as new carpet and headboards. The renovated floors also received corridor enhancements, including new carpet, vinyl wall coverings, ceiling light fixtures, new paint on the ceilings and door trims, and new FF&E. The project was completed in March 2018.
Mandarin Oriental
The Langham, Boston, Boston, MA
Service(s): Cost Estimating
Location: Boston, MA
Division: Cumming
Cumming is providing pre-contract and initial post-contract cost management services for this project, which consists of the renovation of 317 keys and 25,000 sq. ft. of public space in an historic hotel in downtown Boston. Our role started in the schematic design phase, where we attended design meetings and provided independent estimates and cost advice in support of final design decisions. Subsequently, we led a value engineering effort to return the design to budget and provided initial post-contract cost management services through 90% buyout of the GMP.
Renovations to this historic property, which was identified as a Boston Landmark in 1978, include a new canopy and awnings at the main entrance, along with modern uplighting to illuminate the building; a new street entrance for the lobby bar, which will be separated from the lobby by a new glass screen; a redesigned lobby, including a changed floorplan and color palette; and upgrades to all of the guestrooms. The hotel’s event and meeting spaces are also being renovated.
The Langham, Boston
Dream Hotel, Atlanta, GA
Service(s): Project Management
Location: Boston, MA
Division: Lehrer Cumming
Lehrer Cumming is providing project management services for the new 212-key Dream Hotel in Atlanta, Georgia. The project consists of two 12-story towers and spans 2.5 acres. The hotel will include 59 private residences, a spa, two rooftop pools, five dining and nightlife venues, and a 17,000-square-foot lounge. In addition, the property will contain 60,000 square feet of office and retail space. Dream Hotel Group plans to debut the new property in 2022.